IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / TLS_2015_ES_V01_M / variable [F6]
central

Enterprise Survey 2015

Timor-Leste, 2015 - 2016
Get Microdata
Reference ID
TLS_2015_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Jun 26, 2017
Last modified
Jun 26, 2017
Page views
8053
Downloads
359
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • timor_leste_2015_full_data

Informal Gift/Payment Expected Or Requested For A Construction-Related Permit (g4)

Data file: timor_leste_2015_full_data

Overview

Valid: 39
Invalid: 87
Type: Discrete
Decimal: 0
Start: 632
End: 633
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a construction-related permit, was an informal gift or payment expected or requested?
Categories
Value Category
-9 Don't know (spontaneous)
-8 Refusal (spontaneous)
1 Yes
2 No
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
1) Bribe for construction permit. Self-explanatory
2) Sensitive question, no clarification can be offered
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.