IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SWZ_2016_ES_V01_M / variable [F5]
central

Enterprise Survey 2016

Swaziland, 2016
Get Microdata
Reference ID
SWZ_2016_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Jun 26, 2017
Last modified
Jun 26, 2017
Page views
8353
Downloads
334
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • swaziland_2016_full_data

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: swaziland_2016_full_data

Overview

Valid: 12
Invalid: 138
Type: Discrete
Decimal: 0
Start: 222
End: 223
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 Don't know (spontaneous)
-6 Still in process
-5 Application denied
1 One minute or less
2
5
8
14
30
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for water connection. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.