IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SLV_2006-2016_ES-P_V01_M / variable [F5]
central

Enterprise Survey 2006-2010-2016

El Salvador, 2006 - 2016
Get Microdata
Reference ID
SLV_2006-2016_ES-P_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Jun 26, 2017
Last modified
Jun 26, 2017
Page views
15245
Downloads
1478
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • ElSalvador_2006_2010_2016

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: ElSalvador_2006_2010_2016

Overview

Valid: 101
Invalid: 1671
Type: Discrete
Decimal: 0
Start: 632
End: 634
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 Don't know (spontaneous)
-6 Still in process
-5 Application denied
1 One minute or less
2
3
4
5
7
8
10
14
15
18
20
22
28
30
45
60
90
120
180
190
200
300
365
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.