IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SLV_2006-2016_ES-P_V01_M / variable [F5]
central

Enterprise Survey 2006-2010-2016

El Salvador, 2006 - 2016
Get Microdata
Reference ID
SLV_2006-2016_ES-P_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Jun 26, 2017
Last modified
Jun 26, 2017
Page views
14821
Downloads
1467
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • ElSalvador_2006_2010_2016

Average Length Of Water Shortages (Affecting Production) In Last Fiscal Year (c17)

Data file: ElSalvador_2006_2010_2016

Overview

Valid: 183
Invalid: 1589
Type: Discrete
Decimal: 0
Start: 642
End: 644
Width: 3
Range: -
Format:

Questions and instructions

Literal question
How long did these incidents of insufficient water supply last on average?
Categories
Value Category
-9 Don't know (spontaneous)
1 One hour or less
2
3
4
5
6
7
8
9
10
12
14
15
18
20
22
23
24
48
60
69
72
96
100
150
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Duration of water shortage can be estimated by considering the average duration of water insufficiencies that took place in a typical month.

Others

Notes
c17. In 2009, how long did the average water shortage (affecting production) last?
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.