IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NER_2017_ES_V01_M / variable [F4]
central

Enterprise Survey 2017

Niger, 2017
Get Microdata
Reference ID
NER_2017_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Oct 10, 2017
Last modified
Oct 10, 2017
Page views
8191
Downloads
750
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • niger_2017_full_data

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: niger_2017_full_data

Overview

Valid: 17
Invalid: 134
Type: Discrete
Decimal: 0
Start: 1347
End: 1349
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category
-9 Don't know (spontaneous)
-6 Still in process
-5 Application denied
1 One day or less
6
7
10
14
20
30
60
90
92
365
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Waiting time for construction permit. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.