IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NIC_2016_ES_V01_M / variable [F2]
central

Enterprise Survey 2016

Nicaragua, 2016 - 2017
Get Microdata
Reference ID
NIC_2016_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Oct 10, 2017
Last modified
Oct 10, 2017
Page views
7711
Downloads
273
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • nicaragua_2016_full_data

Average Length Of Water Shortages (Affecting Production) In Last Fiscal Year (c17)

Data file: nicaragua_2016_full_data

Overview

Valid: 22
Invalid: 311
Type: Discrete
Decimal: 0
Start: 198
End: 199
Width: 2
Range: -
Format:

Questions and instructions

Literal question
How long did these incidents of insufficient water supply last on average?
Categories
Value Category
-9 Don't know (spontaneous)
1 One hour or less
2
3
5
6
8
24
48
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Duration of water shortage can be estimated by considering the average duration of water insufficiencies that took place in a typical month.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.