IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / EGY_2016_ES_V01_M / variable [F2]
central

Enterprise Survey 2016

Egypt, Arab Rep., 2016 - 2017
Get Microdata
Reference ID
EGY_2016_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Oct 10, 2017
Last modified
Oct 10, 2017
Page views
18351
Downloads
932
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • egypt_2016_expanded
  • egypt_2016_full_data

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: egypt_2016_expanded

Overview

Valid: 80
Invalid: 1747
Type: Discrete
Decimal: 0
Start: 260
End: 262
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 Don't know (spontaneous)
-7 Never regiestered (spontaneous)
-6 Still in process
-5 Application denied
1 One year or less
2
5
6
7
9
10
15
18
25
30
45
60
90
99
120
150
180
200
350
365
720
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for electrical connection. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.