IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / BOL_2017_ES_V01_M / variable [F3]
central

Enterprise Survey 2017

Bolivia, 2017
Get Microdata
Reference ID
BOL_2017_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Oct 10, 2017
Last modified
Oct 10, 2017
Page views
10093
Downloads
1405
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • bolivia_2017_full_data

Informal Gift/Payment Expected Or Requested For An Electrical Connection? (c5)

Data file: bolivia_2017_full_data

Overview

Valid: 78
Invalid: 286
Type: Discrete
Decimal: 0
Start: 209
End: 210
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for an electrical connection, was an informal gift or payment expected or requested?
Categories
Value Category
-9 Don't know (spontaneous)
-8 Refusal (spontaneous)
1 Yes
2 No
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Sensitive question, no clarification can be offered

Others

Notes
C.5 ¿Se esperaba o le fue solicitado algún regalo o pago informal para obtener la conexión eléctrica?
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.