IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / BOL_2017_ES_V01_M / variable [F3]
central

Enterprise Survey 2017

Bolivia, 2017
Get Microdata
Reference ID
BOL_2017_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Oct 10, 2017
Last modified
Oct 10, 2017
Page views
10200
Downloads
1405
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • bolivia_2017_full_data

Did You Experience Insufficient Water Supply For Production In Last Fiscal Yr? (c15)

Data file: bolivia_2017_full_data

Overview

Valid: 118
Invalid: 246
Type: Discrete
Decimal: 0
Start: 238
End: 239
Width: 2
Range: -
Format:

Questions and instructions

Literal question
Over fiscal year [insert last complete fiscal year], did this establishment experience insufficient water supply for production?
Categories
Value Category
-9 Don't know (spontaneous)
-7 Does not apply
1 Yes
2 No
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Insufficient water supply: whenever there is equipment failure or cessation of production operations due to the lack or reduction of water supply.
Question post text
If answer is No or Don't Know then GO TO QUESTION C.18

Others

Notes
C.15 Durante el año fiscal 2016 ¿tuvo este establecimiento una provisión insuficiente de agua para su producción?
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.