IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NGA_2014_SUREPIE-ML_V01_M / variable [F1]
central

Subsidy Reinvestment and Empowerment Programme Maternal and Child Health Initiative Impact Evaluation (SURE-P MCH) 2014 - 2015, Midline Survey

Nigeria, 2014 - 2015
Get Microdata
Reference ID
NGA_2014_SUREPIE-ML_v01_M
Producer(s)
Pedro Rosa Dias, Marcos Vera-Hernández, Marcus Holmlund, Pamela Jervis Ortiz, Qiao Wang
Metadata
DDI/XML JSON
Study website
Created on
Sep 19, 2018
Last modified
Sep 07, 2022
Page views
80627
Downloads
220
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • sure_p_facility_all
  • sure_p_household_all
  • sure_p_midwife_all
  • sure_p_wdc_all

1.2.16 In the dry season, how long does it take to fetch water from the main sou (dry_distance_hours)

Data file: sure_p_facility_all

Overview

Valid: 912
Invalid: -
Minimum: -999
Maximum: 24
Type: Continuous
Range: -
Format: Numeric

Description

Source of information
1.2.16 In the dry season, how long does it take to fetch water from the main sou

Imputation and derivation

Imputation
1.2.16 In the dry season, how long does it take to fetch water from the main sou

Others

Security
1.2.16 In the dry season, how long does it take to fetch water from the main sou
Notes
"HOURS"
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.