IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / ECU_2017_ES_V01_M / variable [F1]
central

Enterprise Survey 2017

Ecuador, 2017
Get Microdata
Reference ID
ECU_2017_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Sep 19, 2018
Last modified
Sep 19, 2018
Page views
7619
Downloads
254
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • ecuador_2017_full_data

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: ecuador_2017_full_data

Overview

Valid: 29
Invalid: 332
Type: Discrete
Decimal: 0
Start: 295
End: 296
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 Don't know (spontaneous)
-6 Still in process
-5 Application denied
1 One minute or less
2
6
7
8
15
19
25
30
45
60
90
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for a water connection: period in days between when the application was completed and submitted until the connection was provided.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.