IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RUS_2009_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2009

Russian Federation, 2008 - 2009
Get Microdata
Reference ID
RUS_2009_ES_v01_M_WB
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Study website Interactive tools
Created on
Sep 29, 2011
Last modified
Mar 29, 2019
Page views
14545
Downloads
1026
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Russian
    Federation-2009--full
    data-

informal gift/payment expected or requested for a construction-related permit (g4)

Data file: Russian Federation-2009--full data-

Overview

Valid: 194
Invalid: 810
Type: Discrete
Decimal: 0
Start: 732
End: 733
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a construction-related permit, was an informal gift or payment expected or requested?
Categories
Value Category
-9 don't know
-8 refusal
1 yes
2 no
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
1) Bribe for construction permit. Self-explanatory
2) Sensitive question, no clarification can be offered
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.