IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SYR_2009_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2009

Syrian Arab Republic, 2009
Get Microdata
Reference ID
SYR_2009_ES_v01_M_WB
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website Interactive tools
Created on
Sep 29, 2011
Last modified
Mar 29, 2019
Page views
14221
Downloads
199
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Syria-2009--full
    data-

how much would it cost to purchase Land and buildings (LCUs) (q86b)

Data file: Syria-2009--full data-

Overview

Valid: 404
Invalid: 104
Minimum: 0
Maximum: 8000000008
Mean: 110788507.426
Standard deviation: 440577103.704
Type: Continuous
Decimal: 0
Start: 1757
End: 1766
Width: 10
Range: -
Format:

Questions and instructions

Literal question
If this establishment had to hypothetically purchase the land and buildings, and machinery and equipment in use now, as they are in their current condition, how much would it cost to purchase each of the following? ( This is equivalent to the market value)
Categories
Value Category
-9 Don't know
-8 Refusal to answer
-7 Does not apply
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.