IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / ARG_2006-2017_ES-P_V01_M / variable [F2]
central

Enterprise survey 2006-2017

Argentina, 2006 - 2017
Get Microdata
Reference ID
ARG_2006-2017_ES-P_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Mar 29, 2019
Last modified
Mar 29, 2019
Page views
10914
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • Argentina_2006_2010_2017

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Argentina_2006_2010_2017

Overview

Valid: 137
Invalid: 2971
Minimum: -9
Maximum: 365
Type: Discrete
Decimal: 0
Start: 392
End: 394
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 Don't know (spontaneous)
-6 Still in process
-5 Application denied
1 One minute or less
2
3
4
5
6
7
10
15
17
20
25
30
40
45
60
90
120
180
365
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for a water connection: period in days between when the application was completed and submitted until the connection was provided.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.