IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GMB_2018_ES_V01_M / variable [F1]
central

Enterprise Survey 2018

Gambia, The, 2018
Get Microdata
Reference ID
GMB_2018_ES_v01_M
Producer(s)
The World Bank
Metadata
DDI/XML JSON
Created on
Dec 05, 2019
Last modified
Dec 05, 2019
Page views
5409
Downloads
284
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • gambia_2018_full_data.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: gambia_2018_full_data.dta

Overview

Valid: 12
Invalid: 139
Minimum: -9
Maximum: 730
Mean: 104.083333333333
Standard deviation: 222.629516271207
Type: Discrete
Decimal: 2
Range: -9 - 730
Format: Numeric

Questions and instructions

Literal question
G. LAND AND PERMITS
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 Don't know (spontaneous) 1
0.7%
-6 Still in process 0
0%
-5 Application denied 0
0%
1 One day or less 1
0.7%
3 1
0.7%
5 1
0.7%
7 1
0.7%
14 3
2%
15 1
0.7%
90 1
0.7%
365 1
0.7%
730 1
0.7%
NA 139
92.1%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© 2025, IHSN Survey Catalog, All Rights Reserved.