IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GMB_2018_ES_V01_M / variable [F1]
central

Enterprise Survey 2018

Gambia, The, 2018
Get Microdata
Reference ID
GMB_2018_ES_v01_M
Producer(s)
The World Bank
Metadata
DDI/XML JSON
Created on
Dec 05, 2019
Last modified
Dec 05, 2019
Page views
5862
Downloads
305
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • gambia_2018_full_data.dta

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: gambia_2018_full_data.dta

Overview

Valid: 15
Invalid: 136
Minimum: -9
Maximum: 90
Mean: 25.7333333333333
Standard deviation: 31.2054635021009
Type: Discrete
Decimal: 2
Range: -9 - 90
Format: Numeric

Questions and instructions

Literal question
C. INFRASTRUCTURE AND SERVICES
In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 1
0.7%
-7 Never regiestered (spontaneous) 0
0%
-6 Still in process 1
0.7%
-5 Application denied 0
0%
1 One year or less 1
0.7%
7 1
0.7%
9 2
1.3%
10 1
0.7%
14 1
0.7%
21 1
0.7%
30 3
2%
60 1
0.7%
90 2
1.3%
NA 136
90.1%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.