IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GMB_2018_ES_V01_M / variable [F1]
central

Enterprise Survey 2018

Gambia, The, 2018
Get Microdata
Reference ID
GMB_2018_ES_v01_M
Producer(s)
The World Bank
Metadata
DDI/XML JSON
Created on
Dec 05, 2019
Last modified
Dec 05, 2019
Page views
5734
Downloads
304
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • gambia_2018_full_data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: gambia_2018_full_data.dta

Overview

Valid: 2
Invalid: 149
Minimum: 21
Maximum: 100
Mean: 60.5
Standard deviation: 55.8614357137373
Type: Discrete
Decimal: 2
Range: 21 - 100
Format: Numeric

Questions and instructions

Literal question
C. INFRASTRUCTURE AND SERVICES
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 0
0%
-5 Application denied 0
0%
1 One minute or less 0
0%
21 1
0.7%
100 1
0.7%
NA 149
98.7%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.