IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GMB_2018_ES_V01_M / variable [F1]
central

Enterprise Survey 2018

Gambia, The, 2018
Get Microdata
Reference ID
GMB_2018_ES_v01_M
Producer(s)
The World Bank
Metadata
DDI/XML JSON
Created on
Dec 05, 2019
Last modified
Dec 05, 2019
Page views
5661
Downloads
304
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • gambia_2018_full_data.dta

Average Length of Water Shortages (Affecting Production) In Last Fiscal Year (c17)

Data file: gambia_2018_full_data.dta

Overview

Valid: 7
Invalid: 144
Minimum: 1
Maximum: 18
Mean: 7.85714285714286
Standard deviation: 5.95618925792242
Type: Discrete
Decimal: 2
Range: 1 - 18
Format: Numeric

Questions and instructions

Literal question
C. INFRASTRUCTURE AND SERVICES
How long did these incidents of insufficient water supply last on average?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
1 One hour or less 1
0.7%
2 1
0.7%
6 2
1.3%
10 1
0.7%
12 1
0.7%
18 1
0.7%
NA 144
95.4%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.