IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / STP_2018_MTF_V01_M / variable [F3]
central

Multi-Tier Framework for Measuring Energy Access 2018

São Tomé and Príncipe, 2018
Get Microdata
Reference ID
STP_2018_MTF_v01_M
Producer(s)
ESMAP
Metadata
DDI/XML JSON
Created on
Dec 05, 2019
Last modified
Dec 05, 2019
Page views
25131
Downloads
436
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • stp_hh_dataset

C.46 How many days after you applied for the mini-grid connection did your house (time_miniconnect)

Data file: stp_hh_dataset

Overview

Valid: 31
Invalid: 2365
Minimum: 0
Maximum: 888
Mean: 516.258
Standard deviation: 444.662
Type: Continuous
Decimal: 0
Start: 1560
End: 1562
Width: 3
Range: 0 - 888
Format: Numeric

Questions and instructions

Literal question
C.46 How many days after you applied for the mini-grid connection did your household get connected?
Interviewer instructions
Insert 0 if immediate

Description

Source of information
This module should be completed by the most knowledgeable member on household electricity. Concerted answers should be allowed.

Others

Notes
"C.46 How many days after you applied for the mini-grid connection did your household get connected?"
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.