IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / IDN_1982_AMS_V01-ID_M / variable [F1]
central

Annual Manufacturing Survey 1982

Indonesia, 1982
Get Microdata
Reference ID
IDN_1982_AMS_v01-ID_M
Producer(s)
Sub Direktorat Statistik Industri Besar dan Sedang
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
4425
Downloads
108
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • INDS82

Nilai Stok barang produksi setengah jadi pd akhir-awal tahun 1982 (SHFVCU82)

Data file: INDS82

Overview

Valid: 0
Invalid: 0
Minimum: -1063250
Maximum: 4440690
Type: Continuous
Decimal: 0
Start: 1437
End: 1448
Width: 12
Range: -1063250 - 4440690
Format: Numeric

Questions and instructions

Literal question
Stock (persediaan) barang-barang yang sedang dalam pengolahan (setengah jadi) (selisih nilai stock)

Description

Definition
Nilai stock barang-barang yang masuk dalam pengolahan (setengah jadi), yang belim dapat ijual dan masih harus mengalami proses selanjutnya sampai barang jadi.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.