IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MNE_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Montenegro, 2019
Get Microdata
Reference ID
MNE_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
7962
Downloads
147
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • montenegro_2019_full_data

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: montenegro_2019_full_data

Overview

Valid: 0
Invalid: 0
Type: Discrete
Decimal: 0
Start: 1534
End: 1536
Width: 3
Range: -9 - 400
Format: Numeric

Questions and instructions

Literal question
G.3 In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Wait for a construction-related permit
Categories
Value Category
-9 Don't know (spontaneous)
-6 Still in process
-5 Application denied
1 One day or less
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.