IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MNE_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Montenegro, 2019
Get Microdata
Reference ID
MNE_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
8294
Downloads
150
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • montenegro_2019_full_data

Cost For Establishment To Re-Purchase All of Its Machinery (n7a)

Data file: montenegro_2019_full_data

Overview

Valid: 0
Invalid: 0
Type: Discrete
Decimal: 0
Start: 2055
End: 2062
Width: 8
Range: -9 - 10360000
Format: Numeric

Questions and instructions

Literal question
N.7 Hypothetically, if this establishment were to purchase all the machinery, vehicles, and equipment it uses now, in their current condition and regardless of whether the establishment owns them or not, how much would they cost, independently of whether they are owned, rented or leased?
- Machinery, vehicles, and equipment
Categories
Value Category
-9 Don't know (spontaneous)
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.