IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / TUR_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Turkiye, 2018 - 2019
Get Microdata
Reference ID
TUR_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jun 14, 2022
Page views
5906
Downloads
175
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • turkey_2019_full_data

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: turkey_2019_full_data

Overview

Valid: 129
Invalid: 1534
Type: Discrete
Decimal: 0
Start: 1414
End: 1416
Width: 3
Range: -9 - 500
Format: Numeric

Questions and instructions

Literal question
G.3 In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 Don't know (spontaneous) 5
3.9%
-6 Still in process 6
4.7%
-5 Application denied 0
0%
1 One day or less 17
13.2%
2 1
0.8%
3 5
3.9%
4 2
1.6%
5 5
3.9%
7 13
10.1%
8 1
0.8%
9 1
0.8%
10 6
4.7%
11 1
0.8%
13 1
0.8%
14 2
1.6%
15 13
10.1%
16 1
0.8%
20 9
7%
21 1
0.8%
25 1
0.8%
30 21
16.3%
60 6
4.7%
70 2
1.6%
90 4
3.1%
120 1
0.8%
240 1
0.8%
360 1
0.8%
365 1
0.8%
500 1
0.8%
Sysmiss 1534
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.