IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / TUR_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Turkiye, 2018 - 2019
Get Microdata
Reference ID
TUR_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jun 14, 2022
Page views
6184
Downloads
175
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • turkey_2019_full_data

Over Last 3 Years, Adopt Other Pollution Control Measures (BMGc23j)

Data file: turkey_2019_full_data

Overview

Valid: 1636
Invalid: 27
Type: Discrete
Decimal: 0
Start: 2205
End: 2206
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
BMGC.23 Over the last three years, did this establishment adopt any of the following measures?
- Other pollution control measures
Categories
Value Category Cases
-9 Don't know (spontaneous) 21
1.3%
-7 Does not apply (spontaneous) 26
1.6%
1 Yes 168
10.3%
2 No 1421
86.9%
Sysmiss 27
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
ASK IF THE ANSWER TO AT LEAST TWO OPTIONS IS "YES", OTHERWISE GO TO BMGC.25
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.