IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / TUR_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Turkiye, 2018 - 2019
Get Microdata
Reference ID
TUR_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jun 14, 2022
Page views
5950
Downloads
175
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • turkey_2019_full_data

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: turkey_2019_full_data

Overview

Valid: 106
Invalid: 1557
Type: Discrete
Decimal: 0
Start: 212
End: 214
Width: 3
Range: -9 - 180
Format: Numeric

Questions and instructions

Literal question
C.4 In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 3
2.8%
-6 Still in process 1
0.9%
-5 Application denied 2
1.9%
1 One day or less 41
38.7%
2 10
9.4%
3 12
11.3%
4 3
2.8%
5 2
1.9%
6 2
1.9%
7 13
12.3%
10 4
3.8%
12 1
0.9%
15 5
4.7%
21 1
0.9%
30 4
3.8%
100 1
0.9%
180 1
0.9%
Sysmiss 1557
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.