IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MNG_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Mongolia, 2019
Get Microdata
Reference ID
MNG_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
6923
Downloads
134
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • mongolia_2019_full_data.dta

When Was An Under-Performing Non-Manager Reassigned or Dismissed? (BMr11)

Data file: mongolia_2019_full_data.dta

Overview

Valid: 165
Invalid: 195
Minimum: -9
Maximum: 3
Mean: 1.7030303030303
Standard deviation: 2.00676976945855
Type: Discrete
Decimal: 0
Start: 620
End: 621
Width: 2
Range: -9 - 3
Format: Numeric

Questions and instructions

Literal question
BMR.11. Over the last complete fiscal year [Insert last complete fiscal year], when was an underperforming non-manager reassigned or dismissed?
Categories
Value Category Cases
-9 Don't know (spontaneous) 1
0.6%
-7 DOES NOT APPLY (SPONTANEOUS) 5
3%
1 Within 6 months of identifying under-performance 71
43%
2 After 6 months of identifying under-performance 10
6.1%
3 Rarely or never 78
47.3%
Sysmiss 195
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.