IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MNG_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Mongolia, 2019
Get Microdata
Reference ID
MNG_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
6951
Downloads
134
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • mongolia_2019_full_data.dta

How Many Meetings With Top Manager More Than One Other Participant Involved? (BMt4)

Data file: mongolia_2019_full_data.dta

Overview

Valid: 88
Invalid: 272
Minimum: 1
Maximum: 5
Mean: 1.34090909090909
Standard deviation: 0.623050774417794
Type: Discrete
Decimal: 0
Start: 1488
End: 1489
Width: 2
Range: 1 - 5
Format: Numeric

Questions and instructions

Literal question
BMT.4. In a typical week, how many meetings that involve the top manager include more than one other participant?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
1 Fewer than 5 meetings 62
70.5%
2 Between 5 and 10 meetings 24
27.3%
3 Between 11 and 15 meetings 1
1.1%
4 Between 16 and 20 meetings 0
0%
5 More than 20 meetings 1
1.1%
Sysmiss 272
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.