IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MNG_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Mongolia, 2019
Get Microdata
Reference ID
MNG_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
7089
Downloads
136
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • mongolia_2019_full_data.dta

Cost For Establishment To Re-Purchase All of Its Machinery (n7a)

Data file: mongolia_2019_full_data.dta

Overview

Valid: 121
Invalid: 239
Minimum: -9
Maximum: 500000000000
Mean: 10902464669.876
Standard deviation: 55451270016.366
Type: Discrete
Decimal: 0
Start: 2158
End: 2169
Width: 12
Range: -9 - 500000000000
Format: Numeric

Questions and instructions

Literal question
N.7. Hypothetically, if this establishment were to purchase all the machinery, vehicles, and equipment it uses now, in their current condition and regardless of whether the establishment owns them or not, how much would they cost, independently of whether they are owned, rented or leased?
Categories
Value Category Cases
-9 Don't know (spontaneous) 6
100%
Sysmiss 239
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.