IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MNG_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Mongolia, 2019
Get Microdata
Reference ID
MNG_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
7041
Downloads
136
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • mongolia_2019_full_data.dta

Over Last 3 Years, Was Max. Payback Time vs. Non-Energy Efficiency Measures (BMGc29)

Data file: mongolia_2019_full_data.dta

Overview

Valid: 38
Invalid: 322
Minimum: 1
Maximum: 3
Mean: 1.94736842105263
Standard deviation: 0.803619125229905
Type: Discrete
Decimal: 0
Start: 2343
End: 2344
Width: 2
Range: 1 - 3
Format: Numeric

Questions and instructions

Literal question
BMGC.29. Over the last three years, was this maximum payback time longer than, equal to, or shorter than the average one applied to non-energy efficiency related measures?
Categories
Value Category Cases
-9 Don't Know (Spontaneous) 0
0%
1 Longer 13
34.2%
2 Equal 14
36.8%
3 Shorter 11
28.9%
Sysmiss 322
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.