IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MNG_2019_ES_V01_M / variable [F1]
central

Enterprise Survey 2019

Mongolia, 2019
Get Microdata
Reference ID
MNG_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
6789
Downloads
134
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • mongolia_2019_full_data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: mongolia_2019_full_data.dta

Overview

Valid: 45
Invalid: 315
Minimum: -6
Maximum: 60
Mean: 5.68888888888889
Standard deviation: 10.8036656704654
Type: Discrete
Decimal: 0
Start: 195
End: 196
Width: 2
Range: -6 - 60
Format: Numeric

Questions and instructions

Literal question
C.13. In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 1
5.9%
-5 Application denied 3
17.6%
1 One day or less 13
76.5%
Sysmiss 315
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.