IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MLT_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Malta, 2018 - 2019
Get Microdata
Reference ID
MLT_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
6127
Downloads
165
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • malta_2019_full_data

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: malta_2019_full_data

Overview

Valid: 41
Invalid: 201
Type: Discrete
Decimal: 0
Start: 180
End: 182
Width: 3
Range: -9 - 365
Format: Numeric

Questions and instructions

Literal question
C.4 In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 10
24.4%
-6 Still in process 5
12.2%
-5 Application denied 0
0%
1 One day or less 0
0%
3 1
2.4%
5 1
2.4%
7 1
2.4%
10 1
2.4%
15 1
2.4%
30 6
14.6%
60 6
14.6%
72 1
2.4%
90 4
9.8%
180 2
4.9%
360 1
2.4%
365 1
2.4%
Sysmiss 201
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.