IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MLT_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Malta, 2018 - 2019
Get Microdata
Reference ID
MLT_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
6119
Downloads
165
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • malta_2019_full_data

Average Duration of Power Outages: Hours (c8a)

Data file: malta_2019_full_data

Overview

Valid: 28
Invalid: 214
Type: Discrete
Decimal: 0
Start: 189
End: 190
Width: 2
Range: -9 - 14
Format: Numeric

Questions and instructions

Literal question
C.8 How long did these power outages last on average? Hours
Categories
Value Category Cases
-9 Don't know (spontaneous) 1
3.6%
0 2
7.1%
1 9
32.1%
2 7
25%
3 3
10.7%
4 1
3.6%
5 2
7.1%
6 1
3.6%
8 1
3.6%
14 1
3.6%
Sysmiss 214
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.