IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MLT_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Malta, 2018 - 2019
Get Microdata
Reference ID
MLT_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
6222
Downloads
165
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • malta_2019_full_data

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: malta_2019_full_data

Overview

Valid: 18
Invalid: 224
Type: Discrete
Decimal: 0
Start: 206
End: 207
Width: 2
Range: -9 - 90
Format: Numeric

Questions and instructions

Literal question
C.13 In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 5
27.8%
-6 Still in process 2
11.1%
-5 Application denied 0
0%
1 One day or less 0
0%
7 2
11.1%
15 2
11.1%
21 1
5.6%
30 3
16.7%
60 2
11.1%
90 1
5.6%
Sysmiss 224
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.