IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MLT_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Malta, 2018 - 2019
Get Microdata
Reference ID
MLT_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
6120
Downloads
165
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • malta_2019_full_data

Average Length of Water Shortages (Affecting Production) In Last Fiscal Year (c17)

Data file: malta_2019_full_data

Overview

Valid: 1
Invalid: 241
Type: Discrete
Decimal: 0
Start: 214
End: 215
Width: 2
Range: -9 - 75
Format: Numeric

Questions and instructions

Literal question
C.17 How long did these incidents of insufficient water supply last on average?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
1 One hour or less 0
0%
75 1
100%
Sysmiss 241
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.