IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MLT_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Malta, 2018 - 2019
Get Microdata
Reference ID
MLT_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
6257
Downloads
165
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • malta_2019_full_data

How Much of An Obstacle: Electricity To Operations of This Establishment? (c30a)

Data file: malta_2019_full_data

Overview

Valid: 242
Invalid: 0
Type: Discrete
Decimal: 0
Start: 218
End: 219
Width: 2
Range: -9 - 4
Format: Numeric

Questions and instructions

Literal question
C.30 Using the response options on the card; To what degree is Electricity an obstacle to the current operations of this establishment?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-7 Does not apply 0
0%
0 No obstacle 90
37.2%
1 Minor obstacle 34
14%
2 Moderate obstacle 24
9.9%
3 Major obstacle 57
23.6%
4 Very severe obstacle 37
15.3%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.