IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MLT_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Malta, 2018 - 2019
Get Microdata
Reference ID
MLT_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
6344
Downloads
168
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • malta_2019_full_data

Informal Gift/Payment Expected or Requested For A Construction-Related Permit (g4)

Data file: malta_2019_full_data

Overview

Valid: 67
Invalid: 175
Type: Discrete
Decimal: 0
Start: 1129
End: 1130
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
G.4 In reference to that application for a construction-related permit, was an informal gift or payment expected or requested?
Categories
Value Category Cases
-9 Don't know (spontaneous) 2
3%
-8 Refusal (spontaneous) 1
1.5%
1 Yes 0
0%
2 No 64
95.5%
Sysmiss 175
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.