IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MLT_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Malta, 2018 - 2019
Get Microdata
Reference ID
MLT_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
6427
Downloads
168
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • malta_2019_full_data

Over Last 3 Years, Was Max. Payback Time vs. Non-Energy Efficiency Measures (BMGc29)

Data file: malta_2019_full_data

Overview

Valid: 48
Invalid: 194
Type: Discrete
Decimal: 0
Start: 1856
End: 1857
Width: 2
Range: -9 - 3
Format: Numeric

Questions and instructions

Literal question
BMGC.29 Over the last three years, was this maximum payback time longer than, equal to, or shorter than the average one applied to non-energy efficiency related measures?
Categories
Value Category Cases
-9 Don't Know (Spontaneous) 3
6.3%
1 Longer 16
33.3%
2 Equal 24
50%
3 Shorter 5
10.4%
Sysmiss 194
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
Over the last three years, was this maximum payback time longer than, equal to, or shorter than the average one applied to non-energy efficiency related measures?
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.