IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RUS_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Russian Federation, 2019
Get Microdata
Reference ID
RUS_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
6857
Downloads
125
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • russianfederation_2019_full_data

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: russianfederation_2019_full_data

Overview

Valid: 37
Invalid: 1286
Type: Discrete
Decimal: 0
Start: 282
End: 283
Width: 2
Range: -9 - 35
Format: Numeric

Questions and instructions

Literal question
C.13 In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 7
18.9%
-6 Still in process 3
8.1%
-5 Application denied 0
0%
1 One day or less 4
10.8%
2 2
5.4%
3 3
8.1%
4 1
2.7%
5 5
13.5%
7 2
5.4%
10 2
5.4%
15 1
2.7%
20 2
5.4%
21 1
2.7%
30 3
8.1%
35 1
2.7%
Sysmiss 1286
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.