IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RUS_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Russian Federation, 2019
Get Microdata
Reference ID
RUS_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
6797
Downloads
125
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • russianfederation_2019_full_data

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: russianfederation_2019_full_data

Overview

Valid: 58
Invalid: 1265
Type: Discrete
Decimal: 0
Start: 1766
End: 1767
Width: 2
Range: -9 - 90
Format: Numeric

Questions and instructions

Literal question
G.3 In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 Don't know (spontaneous) 8
13.8%
-6 Still in process 8
13.8%
-5 Application denied 7
12.1%
1 One day or less 1
1.7%
2 1
1.7%
3 1
1.7%
5 1
1.7%
7 3
5.2%
10 2
3.4%
12 4
6.9%
14 2
3.4%
15 4
6.9%
20 1
1.7%
21 3
5.2%
30 5
8.6%
35 2
3.4%
45 1
1.7%
50 1
1.7%
60 2
3.4%
90 1
1.7%
Sysmiss 1265
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.