IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / KGZ_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Kyrgyz Republic, 2018 - 2019
Get Microdata
Reference ID
KGZ_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
9833
Downloads
138
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • kyrgyz_republic_2019_full_data

Average Duration of Power Outages: Hours (c8a)

Data file: kyrgyz_republic_2019_full_data

Overview

Valid: 85
Invalid: 275
Type: Discrete
Decimal: 0
Start: 196
End: 197
Width: 2
Range: -9 - 23
Format: Numeric

Questions and instructions

Literal question
C.8 How long did these power outages last on average? Hours
Categories
Value Category Cases
-9 Don't know (spontaneous) 1
1.2%
0 7
8.2%
1 19
22.4%
2 10
11.8%
3 12
14.1%
4 7
8.2%
5 6
7.1%
6 7
8.2%
7 1
1.2%
8 5
5.9%
10 3
3.5%
12 2
2.4%
18 1
1.2%
20 1
1.2%
23 3
3.5%
Sysmiss 275
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.