IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / KGZ_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Kyrgyz Republic, 2018 - 2019
Get Microdata
Reference ID
KGZ_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
9808
Downloads
138
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • kyrgyz_republic_2019_full_data

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: kyrgyz_republic_2019_full_data

Overview

Valid: 67
Invalid: 293
Type: Discrete
Decimal: 0
Start: 1364
End: 1366
Width: 3
Range: -9 - 500
Format: Numeric

Questions and instructions

Literal question
G.3 In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 Don't know (spontaneous) 4
6%
-6 Still in process 14
20.9%
-5 Application denied 4
6%
1 One day or less 2
3%
4 1
1.5%
6 2
3%
7 3
4.5%
10 1
1.5%
14 1
1.5%
15 1
1.5%
21 2
3%
30 10
14.9%
31 1
1.5%
60 9
13.4%
90 2
3%
140 1
1.5%
180 2
3%
240 1
1.5%
360 1
1.5%
365 4
6%
500 1
1.5%
Sysmiss 293
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.