IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / ALB_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Albania, 2019
Get Microdata
Reference ID
ALB_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
6827
Downloads
123
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • albania_2019_full_data

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: albania_2019_full_data

Overview

Valid: 48
Invalid: 329
Type: Discrete
Decimal: 0
Start: 386
End: 387
Width: 2
Range: -9 - 35
Format: Numeric

Questions and instructions

Literal question
C.13 In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 4
8.3%
-6 Still in process 5
10.4%
-5 Application denied 3
6.3%
1 One day or less 7
14.6%
2 2
4.2%
3 4
8.3%
4 1
2.1%
5 1
2.1%
7 5
10.4%
10 3
6.3%
15 2
4.2%
20 1
2.1%
21 1
2.1%
30 8
16.7%
35 1
2.1%
Sysmiss 329
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.