IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / CYP_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Cyprus, 2018 - 2019
Get Microdata
Reference ID
CYP_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
7349
Downloads
125
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • republic_of_cyprus_2019_full_data

Is Environment/CC Manager Evaluated On Meeting Environmental Targets? (BMGc22)

Data file: republic_of_cyprus_2019_full_data

Overview

Valid: 26
Invalid: 214
Type: Discrete
Decimal: 0
Start: 2043
End: 2044
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
BMGC.22 Is the manager responsible for environmental and climate change issues evaluated against how well the establishment performs on energy consumption, CO2 emissions or other pollution or environmental targets?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
1 Yes 16
61.5%
2 No 10
38.5%
Sysmiss 214
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
Is the manager responsible for environmental and climate change issues evaluated against how well the establishment performs on energy consumption, CO2 emissions or other pollution or environmental targets?
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.