IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / WBG_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

West Bank and Gaza, 2019
Get Microdata
Reference ID
WBG_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
7774
Downloads
103
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • west_bank_and_gaza_2019_full_data

Average Duration of Power Outages: Hours (c8a)

Data file: west_bank_and_gaza_2019_full_data

Overview

Valid: 214
Invalid: 151
Type: Discrete
Decimal: 0
Start: 240
End: 241
Width: 2
Range: -9 - 48
Format: Numeric

Questions and instructions

Literal question
C.8 How long did these power outages last on average? Hours
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
0 9
4.2%
1 13
6.1%
2 7
3.3%
3 8
3.7%
4 4
1.9%
5 3
1.4%
6 4
1.9%
8 152
71%
10 7
3.3%
12 1
0.5%
14 1
0.5%
15 1
0.5%
20 2
0.9%
24 1
0.5%
48 1
0.5%
Sysmiss 151
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.