IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / WBG_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

West Bank and Gaza, 2019
Get Microdata
Reference ID
WBG_2019_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
7843
Downloads
103
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • west_bank_and_gaza_2019_full_data

Average Length of Water Shortages (Affecting Production) In Last Fiscal Year (c17)

Data file: west_bank_and_gaza_2019_full_data

Overview

Valid: 28
Invalid: 337
Type: Discrete
Decimal: 0
Start: 267
End: 268
Width: 2
Range: -9 - 70
Format: Numeric

Questions and instructions

Literal question
C.17 How long did these incidents of insufficient water supply last on average?
Categories
Value Category Cases
-9 Don't know (spontaneous) 1
3.6%
1 One hour or less 0
0%
2 1
3.6%
3 1
3.6%
5 1
3.6%
6 1
3.6%
8 5
17.9%
12 1
3.6%
24 14
50%
30 1
3.6%
48 1
3.6%
70 1
3.6%
Sysmiss 337
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.