IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / LAO_2018_ES_V01_M / variable [F1]
central

Enterprise Survey 2018

Lao PDR, 2018
Get Microdata
Reference ID
LAO_2018_ES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
6517
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • lao_pdr_2018_full_data

How Much of An Obstacle: Electricity To Operations of This Establishment? (c30a)

Data file: lao_pdr_2018_full_data

Overview

Valid: 332
Invalid: 0
Type: Discrete
Decimal: 0
Start: 173
End: 174
Width: 2
Range: -9 - 4
Format: Numeric

Questions and instructions

Literal question
C.30 Using the response options on the card; To what degree is Electricity an obstacle to the current operations of this establishment?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-7 Does not apply 0
0%
0 No obstacle 119
35.8%
1 Minor obstacle 103
31%
2 Moderate obstacle 54
16.3%
3 Major obstacle 33
9.9%
4 Very severe obstacle 23
6.9%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.