IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / KEN_2018_ES_V01_M / variable [F1]
central

Enterprise Survey 2018

Kenya, 2018 - 2019
Get Microdata
Reference ID
KEN_2018_ES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
6315
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • kenya_2018_full_data

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: kenya_2018_full_data

Overview

Valid: 94
Invalid: 907
Type: Continuous
Decimal: 0
Start: 237
End: 239
Width: 3
Range: -9 - 365
Format: Numeric

Questions and instructions

Literal question
C.13 In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 2
11.1%
-6 Still in process 11
61.1%
-5 Application denied 0
0%
1 Less than one day 5
27.8%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.