IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MOZ_2018_MES_V01_M / variable [F1]
central

Micro-Enterprise Survey 2018

Mozambique, 2018 - 2019
Get Microdata
Reference ID
MOZ_2018_MES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
12217
Downloads
139
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • mozambiquemicro_2018_full_data.dta
  • mozambiquemicro_2018_full_data.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: mozambiquemicro_2018_full_data.dta

Overview

Valid: 13
Invalid: 98
Minimum: -6
Maximum: 200
Mean: 36.4615384615385
Standard deviation: 59.5085643480771
Type: Discrete
Decimal: 0
Start: 891
End: 893
Width: 3
Range: -6 - 200
Format: Numeric

Questions and instructions

Literal question
G.3 In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 1
7.7%
-5 Application denied 0
0%
1 One day or less 1
7.7%
4 1
7.7%
5 2
15.4%
10 1
7.7%
15 3
23.1%
30 1
7.7%
60 1
7.7%
120 1
7.7%
200 1
7.7%
Sysmiss 98
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.