Value | Category |
---|---|
1 | Removal of Silt/Vegetation from the Main Canal |
2 | Repair/Replacement of Masonry |
3 | Rehabilitation of Embankment along canal |
4 | Repair/Replacement of secondary valve handles |
5 | Secondary Pipe Flushed of Sediment |
6 | Rehabilitation of Irrigation Ditch |
7 | Repair of Eroded Checkdam |
8 | Repair/Replacement of Tertiary Valve handles |
9 | Rehabilitation of Primary Drainage Canal |
10 | Rehabilitation of other drainage canals |
11 | Other Secondary Pipe Damage |
12 | Repair of Secondary Valve |
13 | None |