IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SRB_2019_ES_V01_M / variable [F2]
central

Enterprise Survey 2019

Serbia, 2019
Get Microdata
Reference ID
SRB_2019_ES_v01_M
Producer(s)
The World Bank (WB), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
7470
Downloads
164
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • serbia_2019_full_data.dta

Over Last 3 Years, Max. Time Period for Return On Investment Of The Measures? (BMGc28)

Data file: serbia_2019_full_data.dta

Overview

Valid: 141
Invalid: 220
Minimum: -9
Maximum: 2
Type: Discrete
Decimal: 0
Start: 2707
End: 2708
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
Over the last three years, was there a maximum time period for the return on investment of the adopted energy efficiency measures?
Categories
Value Category Cases
-9 Don't know (spontaneous) 10
7.1%
1 Yes 39
27.7%
2 No 92
65.2%
Sysmiss 220
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Question post text
If 2 or -9 GO TO BMGD.1
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.